Total Construction Area : 7.969,14 ²
Şakir Demir Primary School 21 Classroom 1 WorkshTotal Construction Area : 10.654,18 m2
- Eyüp Şehit Kubilay Primary School
22 Classroom
2 Science Laboratory
Totally ,consist of 15 Block
-Faculties of Letter and Science
-Demonstration Hotel
60 bed Capacity
Op
Superstructure;
8 Block 41 Flat = 328 Flat
1 flat gross 125 m2
Totally 41.000 m2 Construction Area
Madenler Mahallesi, İdealistkent Caddesi, İdealistkent Sitesi, 5-8 Apt. No:4Z/1 Ümraniye/İSTANBUL
+ 90 216 316 55 00 - [email protected]